Griffiths Engineering was responsible for designing the building, developing site plans, and specifications in-accordance with applicable codes.
Griffiths Engineering also provided construction management services.
Prepared an engineering study for the replacement of the existing culvert which failed.
Phase 2 included preparation of final plans, specifications, and submitting applicable permits. Griffiths Engineering also provided construction observation services.
Designed plans and specifications for the proposed new subdivision. Project included design of all utilities including sewer, water, storm sewer, micro-pool pond, soil erosion and sedimentation control plan and full storm water pollution prevention plan (SWPPP). Applied for applicable permits and obtained approval from planning board for project.
This project consisted of producing design plans and specifications for new pavement sections, horizontal & vertical alignments, sidewalks, curbs, water lines and more.
This project consisted of producing design plans and specifications for new pavement sections, horizontal & vertical alignments, sidewalks, curbs, water lines and more.
Design Plans, Specifications and Water Model Report. Project consisted of modeling the existing distribution system of approximately 500 homes and designing a 500,000 gallon water tank on a new site, new booster pumps, power, control, telemetering and new water mains. The system was modeled with Haestads WaterCadd design software.
Designed plans and specifications for the Town of Unions future restroom facility on all future parks in-accordance with the applicable building codes.
This project consisted of producing design plans and specifications for new pavement sections, horizontal & vertical alignments, sidewalks, curbs, water lines and more. Griffiths Engineering also provided construction inspection services for this project.
Griffiths Engineering was responsible for the site design including plans, specifications and a stormwater pollution prevention plan for a 56 acre planned unit development (PUD) located in the Town of Union. The project included new water lines, sanitary sewer, extensive earthwork, asphalt roadways, landscaping and a complex stormwater collection and treatment system.
Grifftihs Engineering assisted the Town of Conklin with various flood mitigation strategies. This included applying for FEMA Grants under the HMGP 1589-DR-NY and PDM-C FY 2006 programs.
Griffiths Engineering teamed with Woidt Engineering & Consulting to develop a flood study for Our Lady of Lourdes Hospital located in Binghamton, New York. The study was used to determine the cause of the flooding as well as analyze several options to remediate the problem. The study developed several options to control the flooding of the Susquehanna River through flood walls and levees.